1- Alarcón, L. F., & Mardones, D. A. (1998, August). Improving the design-construction interface. In Proceedings of the 6th Annual Meeting of the International Group for Lean Construction (pp. 1-12).
2- Anumba, C. J., & Bouchlaghem, D. M. (2007). A review of approaches to supply chain communications: from manufacturing to construction. Journal of Information Technology in Construction (ITcon), 12(5), 73-102.
3- Anumba, C.J., Bouchlaghem, J.M. & Cutting-Decelle, A.F. (2007). “Concurrent Engineering in Construction.” Taylor & Francis, Abingdon, UK
4- Archibald, R. D. (2003). Managing high-technology programs and projects. John Wiley & Sons.
5- Ashford, J. L. (2002). The management of quality in construction. Routledge.
6- Ballard, G. (2000, July). Positive vs negative iteration in design. In Proceedings Eighth Annual Conference of the International Group for Lean Construction, IGLC-6, Brighton, UK (pp. 17-19).
7- Balouchi, M., Gholhaki, M., & Niousha, A. (2019). Reworks causes and related costs in construction: Case of Parand mass housing project in Iran. International Journal of Quality & Reliability Management, 36(8), 1392-1408.
8- Barber, P., Graves, A., Hall, M., Sheath, D., & Tomkins, C. (2000). Quality failure costs in civil engineering projects. International Journal of Quality & Reliability Management, 17(4/5), 479-492.
9- Burati Jr, J. L., Farrington, J. J., & Ledbetter, W. B. (1992). Causes of quality deviations in design and construction. Journal of construction engineering and management, 118(1), 34-49.
10- Chan, A. P., Lam, P. T., Chan, D. W., Cheung, E., & Ke, Y. (2010). Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of construction engineering and management, 136(5), 484-494.
11- Chen, Q., Reichard, G., & Beliveau, Y. (2007). Interface management-a facilitator of lean construction and agile project management. International Group for Lean Construction, 1(1), 57-66.
12- Chen, Q., Reichard, G., & Beliveau, Y. (2009). Object model framework for interface modeling and IT-oriented interface management. Journal of construction engineering and management, 136(2), 187-198.
13- Construction Industry Institute (CII), 2014, Interface Management Implementation Guideline
14- Fritschi, N. C. (2002). Interface management for design processes: Synergy of hard and soft skills for project management (Doctoral dissertation, MS thesis, FhT Stuttgart-Hochschule für Technik, Stuttgart, Germany).
15- Hickethier, G., Tommelein, I. D., & Gehbauer, F. (2012). Reducing rework in design by comparing structural complexity using a Multi Domain Matrix. Proceedings of IGLC-20, Singapore.
16- Huang, R., Huang, C., Lin, H., and Ku, W. (2008). “Factor Analysis of Interface problems among Construction PArties – A case study of MRT.” Journal of Marine Science and Technology, Vol. 16, No. 1, pp. 52-63
17- Josephson, P. E., Frödell, M., & Polesie, P. (2009, July). Implementing standardisation in medium-sized construction firms: facilitating site managers’ feeling of freedom through a bottom-up approach. In Proceedings for the 17th Annual Conference of the International Group for Lean Construction (pp. 317-326).
18- Kapurch, S. J. (Ed.). (2010). NASA systems engineering handbook. Diane Publishing.
19- Kpamma, E. Z., & Adjei-Kumi, T. (2013, July). Construction permits and flow of projects within the Sunyani Municipality, Ghana. In annual meeting of International Group of Lean Construction (IGLC-21), Fortaleza, Brazil.
20- Lin, Y. C. (2012). Use of BIM approach to enhance construction interface management: a case study. Journal of Civil Engineering and Management, 21(2), 201-217.
21- Lin, Y. C. (2014). Construction 3D BIM-based knowledge management system: a case study. Journal of Civil Engineering and Management, 20(2), 186-200.
22- Liu, Q., Ye, G., Feng, Y., Wang, C., & Peng, Y. (2020). Case-based insights into rework costs of residential building projects in China. International journal of construction management, 20(4), 347-355.
23- Love, P. E., & Edwards, D. J. (2013). Curbing rework in offshore projects: systemic classification of risks with dialogue and narratives. Structure and Infrastructure Engineering, 9(11), 1118-1135.
24- Love, P. E., Edwards, D. J., Watson, H., & Davis, P. (2010). Rework in civil infrastructure projects: Determination of cost predictors. Journal of construction Engineering and Management, 136(3), 275-282.
25- Love, P. E., Matthews, J., Sing, M. C., Porter, S. R., & Fang, W. (2022). State of science: Why does rework occur in construction? What are its consequences? And what can be done to mitigate its occurrence?. Engineering, 18, 246-258.
26- Mahamid, I. (2022). Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), 1500-1507.
27- Morris, P. W. G. (1983). Programme management in a developing nation telecommunications company. International Journal of Project Management, 1(4), 204-208.
28- Mortaheb, M. M., Rahimi, M., & Zardynezhad, S. (2010, October). Interface management in mega oil refinery projects. In 6th International Project Management Conference. Tehran, Iran (pp. 26-27).
29- Nooteboom, U. (2004). Interface management improves on-time, on-budget delivery of megaprojects. Journal of Petroleum Technology, 56(08), 32-34.
30- O'Connor, J. T., & Tucker, R. L. (1986). Industrial project constructability improvement. Journal of Construction Engineering and Management, 112(1), 69-82.
31- Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing reworks occurrence in construction: A study of selected building projects in Nigeria. Journal of building performance, 1(1).
32- Pan, W., Parker, D., & Pan, M. (2023). Problematic Interfaces and Prevention Strategies in Modular Construction. Journal of Management in Engineering, 39(2), 05023001.
33- Senthilkumar, V., Varghese, K., & Chandran, A. (2010). A web-based system for design interface management of construction projects. Automation in Construction, 19(2), 197-212.
34- Shen, W., Tang, W., Wang, Y., Duffield, C. F., Hui, F. K. P., & Zhang, L. (2021). Managing interfaces in large-scale projects: The roles of formal governance and partnering. Journal of Construction Engineering and Management, 147(7), 04021064.
35- Shokri, S., Ahn, S., Lee, S., Haas, C. T., & Haas, R. C. G. (2016). Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2), 04015070.
36- Shokri, S., Safa, M., Haas, C. T., Haas, R. C., Maloney, K., & MacGillivray, S. (2012, May). Interface management model for mega capital projects. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 447-456).
37- Siao, F. C., & Lin, Y. C. (2012). Enhancing construction interface management using multilevel interface matrix approach. Journal of civil engineering and management, 18(1), 133-144.
38- Staats, S. A. (2014). Interface Management in multidisciplinary infrastructure project development: Diminishing integration issues across contractual boundaries in a Systems Engineering environment.
39- Trach, R., Pawluk, K., & Lendo-Siwicka, M. (2019). Causes of rework in construction projects in Ukraine. Archives of Civil Engineering, 65(3).
40- Wasfy, M. (2010). Severity and impact of rework, a case study of a residential commercial tower project in the Eastern Province-KSA. King Fahd University.
41- Wren, D. A. (1967). Interface and interorganizational coordination. Academy of Management Journal, 10(1), 69-81.
42- Ye, G., Feng, Y., Wang, C., & Peng, Y. (2020). Case-based insights into rework costs of residential building projects in China. International journal of construction management, 20(4), 347-355.